These rate schedules have been approved by the State Corporation Commission of Virginia
The wholesale power supplier we purchase power from adds fuel charges and power costs which we must add to the A&N Electric Cooperative base rate. These extra charges are added on each kilowatt-hour for every member. They are collected from the members and passed on to the power supplier. None of the extra charges stay at A&N Electric Cooperative.
File a complaint with the State Corporation Commission
Residential
Schedule A-1 (Residential and Church Service)
Schedule A-2 (Farm, Civic, and Ancillary Residential Service)
Schedule A-1-P (Prepaid Metering)
Schedule TOU-A-1 (Residential Time of Use Service)
Schedule TOU-A-EVS (Residential Time of Use EV Service)
Schedule EF (Excess Facilities)
Schedule NEM-10 (Net Energy Metering Rider)
Rider R (Renewable Energy Certificates)
Schedule NeoGV (PURPA Cogeneration Service)
Schedule SSR (Community Solar Subscription Rider)
Rider SG (Self-Generated Load Rider)
Schedule OL (Outdoor Lighting)
Schedule ESS-TR (Temporary ESS Rider Surcharge)
Schedule PCA-1 (Power Cost Adjustment)
Non-Residential
Schedule B (Commercial and Industrial Service)
Schedule TOU-B (Commercial Time of Use Service)
Schedule CS-1 (Curtailable Service Rider)
Schedule EF (Excess Facilities)
Schedule I (Irrigation Service)
Schedule LP-A (Large Power Schedule)
Schedule LP-B (Large Power Schedule)
Schedule LP-T-SG (Large Power Transmission Self Generation, Backup & Supplemental Service)
Rider SG (Self-Generated Load Rider)
Schedule NEM-10 (Net Energy Metering Rider)
Schedule NeoGV (PURPA Cogeneration Service)
Rider R (Renewable Energy Certificates)
Schedule SGI (Small Generator Interconnections Other Than Net Metering)
Small Agricultural Generation - Schedule SAG