New Construction


Overhead
ANEC will construct at no cost, up to 1,000 feet of single phase overhead distribution line to serve a new member-consumer. A charge may be required for overhead line extensions over 1,000 feet.

Underground
Underground distribution construction is considered a special service and therefore in most cases there will be a charge to the member-consumer who wishes to have the facilities placed underground. The charge for the underground facilities is the estimated cost difference between the overhead facilities that would be constructed at no cost and the desired underground facilities.

Deposits
Deposits are generally required at time of connect unless the consumer has a prior good credit rating with us or can furnish a letter of satisfactory credit from their previous power supplier. Interest is paid on deposits at a rate determined by the Virginia State Corporation Commission. Residential deposits are applied to your bill once good credit has been established for one year. Commercial deposits are applied after a period of two years.

Easements
Right-of-way easements are a pre-construction requirement if necessary to build facilities.

New Service Request
Contact our Engineering Department to request new service construction. Print and complete the New Service Request form (PDF Document 68 KB) and either mail, bring or fax it to our office.

Load Letter
The Load Letter is used to communicate your load information to ANEC. If instructed to complete this form (PDF Document 80 KB) you may print it and either mail, bring or fax the completed form to our office.


Truck onepixel (1K)
A & N Electric Cooperative
P.O. Box 290, Tasley, VA 23441
757-787-9750 · 800-431-2632
Contact Us!
Building
Copyright © 1999-2017, A & N Electric Cooperative